Tuesday, July 2, 2013

Batteries, Head, and More

 
Quick Update; New US Battery House batteries installed, we now have 502 amps for the house bank.  Upgraded battery cables to engine. 



New electric comfort size head installed.  While we were doing the bottom job I installed a thru hull for the macerator and Y valve.


 
 
 
The wind generator is now being installed. Support pole is in and being braced by the mounting kit that came with the tower and the solar panel mounting that is also going in at the same time.
It seems like there is so much to do in such a short time, but it is getting done.
 
We are also have a new Dodger being made using our existing frame..